This historic church was built in the mid 1800’s. When Schramm was hired, the existing timber roof structure was failing and collapsing. The renovation included removal of the entire roof structure and replacement with a new conventional roof system, installation of a new plastered ceiling and wood trim, removal, storage, and replacement of the existing church furniture, installation of a new fire protection system and new carpet, and painting.